5.15.2008

Got a little sidetracked

So I haven't posted an update in a while. Sorry. I got side tracked with finals, Tara's graduation, and what have you. Regardless work hasn't really stopped (or even slowed down much). I finished off the entrance way (in the process of saving for a new door), trimmed out the new attic window, painted an accent wall in the living room (spice up the blah), and completely landscaped the entire backyard the day after I did the bushes. When I say completely landscaped I'm talking 3 yards of topsoil, a couple trees, grass seed, peat moss, got rid of all the scrap I'd been hoarding... the works. I need a better picture of the yard but here's some pictures of the other stuff and 1 of Laser since he didn't manage to sneak into the regular photos.



2.25.2008

More curtains, closets, and doors.

I spent this past weekend getting a few more odds and ends done. I finished hanging the rest of the curtains. I installed a bifold door in the downstairs bathroom to make room for the a shower in the coming conversion to a fullbath. I took some extra whiteboard type material I had sitting around from another project and mounted to the full length of the door in the office. With the door closed I have a giant whiteboard to use with dry-erase markers for working out models and such. I also painted and updated the built in closet in the upstairs hallway. I painted it in the same style as the bathroom, added some new hardware, and picked up some fabric that my aunt was generous enough to sew into a curtain for me. I also included some new pictures of the living room having updated the style a bit. I figured with all the time spent on the hardwood floors it didn't really make sense to hide them under such a large rug. Enjoy.






2.16.2008

A Little Decoration Goes a Long Way

It's reached the point where I'm done with the bulk of the major construction I'm doing at this point (plenty more to come down the road). No I'm focused on cleaning things up and getting it presentable a little. Here's the improvement some curtains graciously donated by my mom can make.







7.04.2007

Who doesn't love demo?

7/3 Tuesday -- I took off a bit earlier today and met up with Erik in the afternoon. He took the task of tearing out the rest of the plaster in the dining room while I got cracking on some odds and ends. He really brought it to those walls and a small ~1ft x 4ft section of plaster over the counter is all that remains. The walls at some parts were full of literally garbage: beer cans, broken plaster, newspapers (dated 1979), god only knows what else. No wonder why I couldn't get the wire snake through to where I wanted to put the light switches. Anyway we got that all cleaned up while I had painted the front door, hit the steps with a second coat, caulked up the cabinet holes from the old hardware, and pulled up some of the floor in the bedroom closet where I want to raise the height of the staircase ceiling. I found finished hardwood floors under the carpet. If I took a picture of it you'd understand what a weird place this was for it. Anyway I pulled up those boards to use for replacing some of the more beat up boards else where and by the time I was ready to cut some flooring it was 9:30 and too late for power tools.

Looking good a coat later

The last day I'll have to look at this


7/4 Wednesday -- Today was a big day, no questions about it. I got started around 11 and Erik was over again by noon. Our main project was to raise and widen the doorway from the kitchen to the dining room. It'll give me a little extra head room and really add to the fluid feel of the house. I originally thought it wasn't a load bearing wall but after doing a little reading found the contrary. Not a big deal. It had two 2 x 4's for the old header which I upgraded to 2 x 6's and added two studs under each side of the header where there had only been one. We ran into a bit of trouble trying to figure out how to transition from cutting the existing studs to getting the new header in place while still supporting the wall. Luckily I had a hydraulic jack in the truck of my car. We were able to jack a 2 x 4 up to the ceiling to support the wall and still had enough room to squeeze in one of the 2 x 6's for the header. With that one in place we could drop the jack and put up the other side. The picture I posted was taken before we added an extra stud under each side for additional support. Not half bad job for a couple of guys who really didn't know what they were doing. After talking to Charles, the neighbor who works construction, the only thing we maybe should've done different was put a sheet of 1/2" plywood between the two header boards so they sat flush with the rest of the studs. Not the end of the world, we'll just have to shim out the trim that goes up later.

A couple of sandwiches later we were ready to tear up the carpet in the living room--the last of the carpet still haunting the house. It was a bit tedious to get through but with Erik pulling tack board up while I hit staples we really got a good rhythm going and banged it out. The floors really have some potential but will need a bit of help getting there. After Erik headed home around 7:30 I went to give the door another coat of paint. I was super disappointed to find that yesterdays coat was all bubbles and awful. Even sanding was no help. I'm going to need to strip it back down and use a primer first. The steps had looked good but with today's rain (last nights actually) they started to spot a little. We'll see how it looks when they dry. I hit the part of the floor that was in really bad shape with some ammonia and retired for what was left of the night.

Such an improvement

Carpet no more